30 Hazardous waste facilities

Waste

30  Hazardous waste facilities

(1)     The construction of a hazardous waste facility is within section 14(1)(p) only if—

(a)     the facility (when constructed) will be in England,

(b)     the main purpose of the facility is expected to be the final disposal or recovery of hazardous waste, and

(c)     the facility is expected to have the capacity

Powered by Lexis+®

Popular documents